Which tests should I require for my excavator undercarriage parts (salt spray, impact, fatigue, wear)?

Excavator undercarriage parts testing in laboratory

I know the sinking feeling of receiving a container of track rollers 1 that look perfect but fail within a month. It damages your reputation and costs you a fortune in warranty claims. You need a way to filter out poor quality before it ever leaves the factory.

To ensure reliability, you must require a specific testing suite: Salt Spray (ISO 9227) for corrosion, Charpy Impact (ISO 148-1) for toughness, Fatigue cycling (SAE J109) for durability, and Wear testing (GB/T 12444). These specific standards act as your legal safety net against manufacturing defects.

Many buyers assume that "quality control" is just a visual check, but in our industry, the real truth lies inside the metal structure. If you do not specify the exact tests you need, you leave the door open for shortcuts. Let me walk you through the exact technical requirements you should place on your next purchase order to protect your business.

What test standards should I cite for each part?

Simply asking a factory for "good quality" is dangerous because it is subjective and legally weak. You need to speak the language of international engineering standards to ensure your suppliers take you seriously.

You should specifically cite ISO 9227 for salt spray (480+ hours), ISO 60068-2-27 for impact resistance, and SAE J109 for fatigue life. For wear resistance, reference GB/T 12444 or SAE J2210 standards. These codes provide a pass/fail metric that leaves no room for argument.

Technician performing salt spray test on track shoes

When we manufacture undercarriage parts at Dingtai, we see a clear difference between buyers who know their standards and those who do not. The buyers who cite specific ISO or ASTM standards get the best batches because we know they will check. Here is how you should break down your requirements for the most critical threats to your parts: corrosion, breakage, fatigue, and wear.

Corrosion: Salt Spray Testing (NSS/ASS)

For components like track shoes, rollers, and sprockets, surface protection is vital, especially if you sell to clients in coastal areas or regions that use road salt in winter. You should demand a Neutral Salt Spray (NSS) or Acetic Acid Salt Spray (ASS) test.

  • The Standard: ISO 9227 or ASTM B117 2.
  • The Duration: Do not settle for 24 hours. For high-quality aftermarket parts, require ≥480 hours.
  • The Goal: This verifies that the painting or phosphating process is robust enough to prevent red rust during long ocean transits and initial storage.

Toughness: Impact Testing

This is non-negotiable for clients in mining or rock excavation. If the steel is too brittle, a heavy impact will snap the track link.

  • The Standard: ISO 60068-2-27 or ISO 148-1 (Charpy 3).
  • The Method: We use a "drop hammer" or pendulum on key load-bearing parts like the track shoe assembly and link pitch.
  • The Insight: It is crucial to test this at low temperatures (e.g., -20°C or -40°C) if you sell to northern markets. Steel that is tough at room temperature can shatter like glass in the freezing cold.

Durability: Fatigue Testing

Fatigue is the silent killer. A part might look strong but fail after 3 months of continuous work.

  • The Standard: SAE J109 4.
  • The Requirement: Demand a cycle test of ≥1 million cycles for the track link assembly.
  • The Goal: This simulates years of bending and pulling forces. If the supplier cannot prove their links survive 1 million cycles, the structural integrity is suspect.

Abrasion: Wear Testing

This is what your customers care about most: "How long will it last?"

  • The Standard: GB/T 12444 or SAE J2210.
  • The Method: pin-on-disk abrasion testing 5 in the lab, but also field testing.
  • The Metric: We look for the "wear loss quantity." For premium parts, you want the wear performance to be at least 15% better than the standard industry baseline.

Here is a summary table you can copy directly into your supplier emails:

Test Type Target Component Standard to Cite Acceptance Criteria
Salt Spray Rollers, Shoes, Links ISO 9227 (NSS/ASS) No Red Rust after 480 Hours
Impact Track Shoes, Links ISO 60068-2-27 No cracking under specified drop load
Fatigue Track Chains SAE J109 / Internal Survive >1,000,000 load cycles
Wear Bushings, Rails GB/T 12444 Wear rate < Standard Baseline

How many samples do I need per test batch?

You cannot test every single roller or link, as destructive testing would leave you with no product to sell. However, testing too few puts you at risk of receiving a bad batch that slipped through quality control.

Adopt the ISO 2859-1 (AQL) standard for sampling. For non-destructive dimension checks, inspect 10-20% of the lot. For destructive tests like impact or fatigue, select 1 to 3 pieces per "Heat Batch" (production run from the same furnace).

Batch sampling of excavator rollers for inspection

Understanding "sampling" is the key to balancing cost and safety. In my factory, we organize production by "Heat Batches." This means a group of products that went through the heat treatment furnace at the exact same time. Since heat treatment is the most critical step for undercarriage parts, parts from the same batch usually have identical properties.

The "Heat Batch" Strategy

For destructive tests (where we break the part to check it), you do not need to test 100 items. You need to test the process.

  • Recommendation: Ask for 2 pieces per Heat Batch for destructive testing (Impact, Sectioning for hardness depth).
  • Why: If the first one passes and the second one passes, it is statistically highly probable that the other 500 pieces in that same furnace basket are also good. If one fails, the whole batch must be quarantined.

The AQL Approach for Non-Destructive Tests

For things we measure without breaking (dimensions, visual finish, thread checks), you need a larger sample size. We use ISO 2859-1 6, also known as the AQL (Acceptable Quality Limit) table.

  • AQL 1.0 or 2.5: This is a standard setting. For a shipment of 1,000 rollers, this might require randomly checking 80 to 125 pieces.
  • Random Selection is Vital: You must stipulate that you or your inspector selects the samples, not the factory. If the factory picks, they will pick the "Golden Samples" they made perfectly just for the test.

Practical Application for Your Orders

If you are buying a mixed container, your sampling plan should look different for each product line. Here is a breakdown of how we typically handle this for our OEM clients:

Product Test Type Sampling Rate Logic
Track Chain Fatigue/Tensile 1 unit per 500 links Destructive, high cost, checks material
Rollers Seal Pressure 100% of units Non-destructive, critical for leaks
Bolts/Nuts Hardness 5 units per lot Checks heat treatment consistency
Track Shoes Dimensions AQL Level II (approx 10%) Ensures bolt-hole alignment

By using this tiered approach, you spend your budget wisely. You test the material properties on a few representative pieces, but you check the fit and finish on a large volume to ensure assembly is smooth for your customers.

Can I get test videos and raw data files?

In the digital age, a PDF report is no longer sufficient proof of quality. It is too easy for dishonest suppliers to edit a document and change the numbers to pass a failed batch.

Yes, you absolutely can and should demand raw data. Request the original .CSV or .XLS files generated by the testing machine and ask for uncut video footage of the destructive tests with your specific order number written on the part.

Computer screen showing raw data graphs from tensile testing

I have worked in this industry long enough to see some bad practices. I have seen suppliers "recycle" old test reports by just changing the date and the customer name. The only way to stop this is to demand digital evidence that is hard to fake.

The Power of Raw Data

Modern testing equipment, like the machines we use for fatigue cycles or tensile strength 7, are essentially computers. They record thousands of data points every second.

  • What to ask for: Do not just accept the "Summary Report." Ask for the "Raw Data Log" or the "Curve Data."
  • Why it works: A human can easily type "50 HRC" into a report. But it is very difficult for a human to fake a raw data file containing 10,000 lines of timestamped sensor readings that plot a perfect stress-strain curve 8. If the file metadata shows it was created three months ago, you know they are lying.

Video Verification Protocol

Video is the ultimate truth-teller. But you have to ask for it in a specific way to prevent them from sending you a stock marketing video.

  • The "Newspaper" Trick: Ask the technician to write your Order Number (PO#) and the Current Date on a piece of paper and tape it to the machine or the part before the test starts.
  • The Shot: The video must show that paper label and the machine screen in the same continuous shot.
  • The Action: Watching the pendulum hit the steel or the machine pulling the chain until it snaps gives you confidence. You can hear the snap. You can see the reading on the digital display.

Digital Deliverables Checklist

When you write your contract, include a "Digital Deliverables" section. This signals to the factory that you are a sophisticated buyer.

Deliverable Requirement Purpose
Video Evidence MP4 format, 1080p, Order # visible in frame Proves the test actually happened for your order
Raw Data .CSV or .XLS format directly from machine Prevents manual editing of results
Photos High-res, metadata (EXIF) intact Verifies date and location of the test
Fracture Surface Macro photo of the broken metal Allows experts to analyze grain structure

If a supplier refuses this, saying "it is too much trouble" or "our machine doesn’t do that," be very suspicious. Every modern lab can do this. It takes 5 minutes. If they won’t do it, they might be hiding a failure.

Should tests be witnessed by third parties?

Self-policing has its limits. Even with video evidence, the factory is still the one controlling the camera. For large investments, you need an unbiased referee on the field.

For large orders or new supplier relationships, third-party witnessing is essential. Hiring an agency like SGS, Intertek, or Bureau Veritas to witness the tests removes the conflict of interest and ensures the protocols are followed strictly.

Third party inspector verifying excavator parts in factory

Is it worth the money? That is the common question. A third-party inspection typically costs between $300 and $800 per man-day. If you are buying $5,000 worth of parts, it makes no sense. But if you are placing a $50,000 order for a mining client, that cost is less than 1% of your risk.

The Conflict of Interest

As a manufacturer, I want to ship products. My quality control team reports to me. While we at Dingtai pride ourselves on honesty, the structural incentive in many factories is to "let it slide" if a result is borderline.

  • The Inspector’s Role: A third-party inspector works for you. They do not care if the factory ships or not. They only care if the number on the screen matches the number on your spec sheet.

Types of Third-Party Services

You don’t always need a full audit. You can choose the level of involvement:

  1. Witnessing: The inspector stands next to the machine while our staff runs the test. They verify the setup, the sample selection, and the result.
  2. Sampling: The inspector walks into the warehouse and picks the boxes to be tested. This is the most powerful service because it prevents us from "cherry-picking" the best parts.
  3. Loading Supervision: They watch the goods get loaded into the container to ensure we don’t swap them out at the last minute.

Establishing "Hold Points"

To make this work, you must write "Hold Points" into your contract.

  • Definition: A Hold Point means "Stop Production." We cannot proceed to painting or packaging until the inspector signs off on the testing.
  • The Benefit: It prevents the nightmare scenario where the goods arrive in the USA, fail your inspection, and now you have to negotiate a return for 20 tons of scrap metal. You catch the problem while the metal is still in China.

When to Use Third Parties?

  • New Suppliers: Always use them for the first 2-3 orders until trust is built.
  • High-Stakes Projects: If these parts are for a major mining company that enforces penalties for downtime, you need the insurance.
  • Disputes: If you previously had quality issues, a third party acts as the neutral judge for the next batch.

We recommend using established firms like SGS 9 or Bureau Veritas 10 for these critical inspections.

Conclusion

To secure your supply chain, demand ISO 9227 (salt spray) and ISO 148-1 (impact) compliance. Use AQL sampling for efficiency, insist on raw digital data to prevent fraud, and deploy third-party inspectors for high-value orders.


Footnotes

1. Overview of track roller components in heavy machinery. ↩︎
2. Standard practice for operating salt spray (fog) apparatus. ↩︎
3. Standardized high strain-rate test for determining material toughness. ↩︎
4. SAE standard defining service test procedures for track links. ↩︎
5. Methodology for measuring wear friction and material loss. ↩︎
6. Sampling procedures for inspection by attributes. ↩︎
7. Definition of the maximum stress a material can withstand. ↩︎
8. Graphical representation of a material’s behavior under load. ↩︎
9. Leading inspection, verification, testing, and certification company. ↩︎
10. Global provider of testing, inspection, and certification services. ↩︎

Cat & Hitachi Undercarriage Parts | Excavator Supplier | Manufacturer
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.