What risk-control tips should I follow for my first excavator undercarriage parts order as a new customer?

Excavator undercarriage parts inspection

I know the anxiety that comes with switching suppliers; one wrong shipment of track chains or rollers can ruin the reputation you built over decades. Let me show you the proven safeguards I use to protect my clients’ interests and ensure peace of mind.

Effective risk control requires a multi-layered approach: verify technical specs via sample testing, negotiate milestone-based payments, and insist on Pre-Shipment Inspections (PSI). Always start with a trial batch to test logistics and quality before committing to full container loads.

Let’s break down the specific strategies expert buyers use to secure their supply chain.

Should I start with a trial order and PSI?

Jumping into a full container order with a new factory is a gamble that smart buyers do not take. If the quality fails, you lose money and trust. There is a much safer way to start our partnership.

You should absolutely begin with a trial order representing between 50% to 70% of a standard batch. Combine this with a Pre-Shipment Inspection (PSI) to verify dimensions and hardness before the goods ever leave the factory floor.

Trial order inspection

Many buyers ask me if they should order just one or two pieces to test. While this seems safe, it is often not practical for heavy undercarriage parts. Shipping costs for a few rollers or a single track chain are very high. Instead, I recommend a "Golden Ratio" for your first order.

The Sweet Spot for Order Volume

A trial order of 50% to 70% of a regular load is the perfect balance. It is large enough to test the manufacturer’s production capacity and consistency. If a factory can make one good roller, that is easy. But making 500 good rollers with the same heat treatment 1 depth requires a strong system. This volume also makes shipping costs reasonable per unit.

For example, if you usually buy a full 20-foot container, start with half a container. You can fill the rest of the space with low-risk items or simply ship a consolidator load 2 (LCL). This limits your financial exposure. If the parts are not right, you are not stuck with a warehouse full of scrap metal.

The Power of Pre-Shipment Inspection (PSI)

Never let a new supplier ship goods without checking them first. You or a third-party agent must visit the factory. In my factory in Fujian, we welcome this. A Pre-Shipment Inspection 3 report gives you eyes in the factory.

Inspection Type What it Checks Why it Matters
Visual Check Paint, finish, packaging labels. Ensures the product looks professional for your customers.
Dimensional Check Bolt hole spacing, track pitch, diameters. Ensures the parts will actually fit the machine.
Hardness Test HRC rating 4 on wear surfaces. Verifies the part will last and is not made of soft steel.

If you skip the PSI, you only find problems when the container arrives in the US. By then, it is too late. The return shipping cost is often more than the value of the goods. A PSI costs a few hundred dollars but saves you thousands. It forces the supplier to take your quality standards seriously from day one.

Can I use partial payments tied to milestones?

Paying 100% upfront to a stranger is terrifying and bad business. You worry the supplier might disappear with your money or delay shipment for months. You need leverage to ensure they keep their promises.

Yes, milestone payments are industry standard for managing financial risk. A typical structure is a 30% deposit to start production, with the remaining balance due only after you receive the Bill of Lading or pass a third-party inspection.

Payment milestones concept

Money is your biggest tool for risk control. In international trade, how you pay is just as important as how much you pay. I always advise new partners to never pay the full amount until they see proof that the work is done.

The 30% Deposit Rule

The standard practice in our industry is a 30% deposit. This covers the cost of raw materials, such as the steel for the track shoes or the casting molds. It shows the supplier that you are serious. However, it also limits your risk. If the worst happens and the deal fails, you only lose 30%, not everything.

The Balance Payment as Leverage

The remaining balance (usually 70%) should be tied to a clear milestone. The best milestone is "Pass of PSI" or "Copy of Bill of Lading 5 (B/L)."

If you tie payment to the Bill of Lading, it means the goods are already on the ship. The supplier cannot hold the goods hostage, and you know the shipment is real. If you tie it to the PSI, you know the quality is good before you pay the rest.

Why Milestones Matter for Custom Orders

If you are ordering custom parts, like a specific bucket design or a modified tensioner, you can break the payments down even further.

Milestone Payment % Purpose
Order Confirmation 30% Covers raw materials and molds.
Sample Approval 10% Confirms the design is correct before mass production.
Production Complete 30% Pays for the labor and processing.
Before Shipment 30% Final release of goods.

This structure keeps the factory motivated. They want the next payment, so they must hit the next deadline. It aligns your goals with their goals. If a supplier refuses these terms and demands 100% upfront, be very careful. It is a major red flag.

How do I validate key parts via sample checks?

A spec sheet tells you nothing about real performance on a rocky job site. If the metal is soft, the track chain breaks in a week. You must see the physical evidence first to trust the quality.

Validating samples is non-negotiable. Do not just look at the finish; you must request a technical agreement first, then test the sample’s hardness, depth of heat treatment, and dimensional accuracy against those agreed standards.

Sample validation process

Many buyers make the mistake of looking at a sample and saying, "It looks shiny, so it must be good." In the undercarriage business, beauty is not enough. You need to know what is inside the metal.

The Technical Agreement (The Ruler)

Before you even look at a sample, sign a technical agreement 6. This document lists the exact requirements. It should say, "The surface hardness must be HRC 52-56," or "The depth of hardening must be 8mm."

Without this agreement, you have no standard to judge the sample. If you find a defect later, the supplier can say, "You never said it needed that hardness." A written agreement prevents this argument. It protects you.

Destructive Testing

When you get the sample, do not just measure it. If it is a small part, cut it open. This is called destructive testing 7. You need to see the cross-section of the metal.

  • Heat Treatment Depth: When you cut a roller or a link, you can see a darker ring around the edge. This is the hardened layer. If this layer is too thin, the part will wear out very fast.
  • Seal Integrity: For rollers, check the floating seals 8. Are they tight? Do they hold the oil? A bad seal means the roller will leak and fail within weeks.

Key Inspection Points for Different Parts

Here is a quick guide on what to check for specific items:

Part Name Critical Check Point Risk if Failed
Track Chain Pin and Bushing fit Chain stretches and jumps off the sprocket.
Sprocket Tooth profile accuracy Eats into the track bushings, causing rapid wear.
Track Shoe Plate thickness Bends or cracks under heavy load on rocks.
Idler Internal bushing material Seizes up and stops rotating, destroying the track.

I always tell my team to provide these detailed reports to our clients. If a supplier cannot show you this data or refuses to let you test a sample, they are hiding something. True quality stands up to testing.

What incoterms minimize my initial risk?

Shipping heavy metal parts across the ocean is complex and expensive. If cargo gets damaged by salt water or stuck in US customs, who pays? You need clear rules to avoid unexpected costs.

For new partnerships, FOB (Free on Board) is often the safest choice. It gives you control over the ocean freight and insurance while the supplier handles local export customs. Avoid EXW (Ex Works) as it places too much liability on you.

Shipping container logistics

Incoterms 9 are the rules that decide who is responsible for the cargo at every step. Choosing the wrong one can cost you a lot of money and give you a lot of headaches.

Why FOB (Free on Board) is Best for You

FOB means the supplier is responsible for the goods until they are loaded onto the ship in China. They handle the trucking from the factory to the port and the Chinese export customs. Once the goods are on the ship, the responsibility shifts to you.

This is good because:

  1. You Control the Freight: You choose the shipping company. You can pick a forwarder you trust in the US.
  2. Transparent Costs: You know exactly what the ocean freight costs. If the supplier handles it (CIF terms), they might mark up the price or choose a cheap, slow boat to save money.
  3. Better Information: Your freight forwarder 10 will update you on where the ship is. You do not have to chase the supplier for updates.

The Risks of EXW (Ex Works) and CIF

  • EXW (Ex Works): The supplier just puts the parts on a pallet at their factory door. You have to arrange everything, including the truck in China and Chinese customs. If there is a problem with Chinese paperwork, you are stuck fixing it. This is too much work for a new buyer.
  • CIF (Cost, Insurance, and Freight): The supplier pays for shipping to your port. This sounds easy, but it has traps. The supplier controls the shipment. They might buy very cheap insurance that is hard to claim. Also, hidden "destination fees" at the US port can be very high with CIF shipments.

Insurance is Vital

Undercarriage parts are heavy and steel. They can rust if the container leaks, or they can break if the ship hits a storm. Always ensure your freight forwarder adds "All Risks" insurance. It is very cheap compared to the value of the goods.

By choosing FOB, you control the insurance. You know you are covered. It is about taking control of the risks you can manage, and letting the supplier manage the risks they are best at (like making the parts).

Conclusion

Risk control is not about luck; it is about process. By using trial orders, split payments, rigorous sample checks, and smart shipping terms like FOB, you protect your business.

Footnotes

1. Industrial process used to alter the physical properties of metals. ↩︎
2. Logistics strategy combining multiple smaller shipments into one container. ↩︎
3. Standard procedure to verify goods meet specifications before shipping. ↩︎
4. Standard scale for measuring the indentation hardness of materials. ↩︎
5. Legal document issued by a carrier detailing the shipment. ↩︎
6. Contract defining specific technical requirements for product manufacturing. ↩︎
7. Testing method that deforms materials to analyze failure points. ↩︎
8. Heavy-duty seals designed to retain oil in tracked machinery. ↩︎
9. Global trade terms defining responsibilities of buyers and sellers. ↩︎
10. Agent responsible for organizing shipments for individuals or corporations. ↩︎

Cat & Hitachi Undercarriage Parts | Excavator Supplier | Manufacturer
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.